Sanyo PJ-NET ORGANIZER POA-PN10 User Manual Page 34

  • Download
  • Add to my manuals
  • Print
  • Page
    / 90
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 33
34
Basic Setting and Operation
When the internal power circuit is failed:
When the life span of lamp is reached:
Replace it with a new lamp immediately and reset the lamp counter. If the projector
is used without reset the lamp counter, the alert mail is sent to users in every power-
on of the projector. This alert mail will not be sent when unchecking the mail sending
condition "When the life span of lamp is reached".
TITLE: Message from projector
01-01-2003 00:59
Projector Model Name: XT10A/XT15A
TCP/IP: 192.168.0.2 Projector Name: myProjector
It sends you following massage.
*The Projector lamp was turned off, because projector power circuit failed.
Unplug the projector from AC outlet and ask servicing to qualified service
personnel.
TITLE: Message from projector
01-01-2003 00:59
Projector Model Name: XT10A/XT15A
TCP/IP: 192.168.0.2 Projector Name: myProjector
It sends you following massage.
*The life span of lamp is reached.
The Projector lamp was turned off, because the projector power circuit failed.
Unplug the projector from AC outlet and ask servicing to a qualified service personnel.
When the lamp use time reaches preselect lamp use time:
The Network Unit sends a free message when the lamp use time reaches the prese-
lected lamp use time. It can be used for preparation of the lamp replacement and the
maintenance required.
TITLE: Message from projector
01-01-2003 00:59
Projector Model Name: XT10A/XT15A
TCP/IP: 192.168.0.2 Projector Name: myProjector
It sends you following massage.
*The lamp use time reaches 800 hours. Prepare the lamp replacement.
Page view 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 89 90

Comments to this Manuals

No comments