SUPER ABSORPTION
92
ENVIRONMENTALLY FRIENDLY TECHNOLOGY
Evaporator cover
Evaporator cover
Generator cover
Generator cover
Don't insulate the motor,
refrigerant pump and sight glass.
75mm thick insulation for hot surface
50mm thick insulation for hot surface
Evaporator cover and chamber cover are
removable in construction
30mm thick insulation for cold surface
30mm thick insulation for cold surface
Model 75mm 30mm 50mm 30mm
LE-01 2.3 1.4 3.3 0.2
LE-02 2.3 1.4 3.3 0.2
LE-03 2.7 1.6 3.9 0.3
LE-11 2.8 1.6 4.0 0.3
LE-12 2.8 1.8 4.0 0.3
LE-13 3.8 1.9 5.5 0.3
LE-14 3.8 2.2 5.5 0.3
LE-21 4.0 2.5 6.1 0.4
LE-22 4.0 2.5 6.1 0.4
LE-23 5.2 3.1 7.6 0.5
LE-24 5.2 3.3 7.6 0.5
LE-31 6.0 3.5 8.5 0.5
LE-32 6.0 3.6 8.5 0.5
LE-41 6.6 3.7 9.9 0.5
LE-42 6.6 3.9 9.9 0.5
LE-51 7.6 4.8 13.8 0.7
LE-52 8.4 5.1 15.0 0.7
LE-53 9.2 5.3 16.1 0.7
Hot surface
insulation(m
2
)
Cold surface
insulation(m
2
)
Notice :
1) Material : Glass wool or rock wool (non-combustible type)
2) The total area includes the area of pipes in the chiller.
3) The machine is coated with rust preventive paint before shipment,
but is not provided with finish paint.
Figure 65. Insulation of LE
Insulation (LE)
In some instances local codes may dictate the use of a rupture disk to
prevent damage to the chiller in the event of overpressurization of the
high and low temperature generators. SANYO units are provided with a
flange for mounting a rupture disk.
At this flange connection, a rupture disk may be installed and connected
to a field-provided overflow tank per Figure 66.
It is the responsibility of the installing contractor to install the rupture disk
on the units and overflow tank (if required) prior to initial chiller startup.
Rupture disk mounting
Rupture disk mounting instructions are as follows:
1. Prior to installing or replacing the rupture disk, insure that a slight
positive pressure is maintained in the chiller with nitrogen gas.
2. Apply Teflon paste to both sides of gasket.
3. Align gasket as shown in Figure 68.
4. Assemble flanges and torque per specifications shown in the manual
of rupture disk.
5. Conduct leak test using nitrogen gas at 49 kPa (0.5 kg/cm
2
G) after
installation of rupture disk.
6. Periodic maintenance should include tightening the rupture disk with
a torque wrench.
4.5
3.2
4 inch
Material : T/#9090-OR
disk
6 inch
disk
A
B
C
(mm)
(mm)
(mm)
174.8
149.4
127.6
222.3
209.6
182.6
C B
A
Pipe
Pipe
Flange
Flange
High tension nut
High tension bolt
To tank
From chiller
Teflon paste
Safety head
: Scope of supply by SANYO
Rupture disk
Safety head
Teflon paste
Gasket
Cap screw
Above 35 QFT
Discharge piping
Rupture disk
Vent piping
Drain
Tank
Support
Figure 66. Piping of rupture disk
Figure 67. Fixing methed of rupture disk
Figure 68. Gasket
Table 18. Insulation data
Page view 47